Hydroelectric turbine Power of a few KW (pico) or up to 100 kW generators, alternators, EMS (energy management systems)

Reference: K.1.1

LEME Mitigation

Increase of the production by retrofit or replacement of equipments

Efficiency > 80% and 85% on generators and alternators

IEC 1116 (Electromechanical equipement Guidefor small installations)

IEC 60034
IEC 1116 (Electromechanical equipement Guidefor small installations)

Estimated pay back time short term : 2-4 years, medium term: 4-6 years, long term : 6-8 years (*)

Medium/Long term

Total installed capacity ≤ 100kW per unit installed